Intumescent paint vs vermiculite fire spray

Both systems protect structural steel so it keeps carrying load in a fire. They get there in very different ways, and the right choice usually comes down to whether the steel will be seen, the FRL required and the budget.

Ary Fire · 17 October 2026
Intumescent coating applied to factory structural steel

When a fire engineer or the NCC calls for steel to achieve an FRL such as 60/-/- or 120/-/-, the steel needs protection that slows how quickly it heats up. In Australia the two most common ways to do that are intumescent paint and vermiculite (cementitious) fire spray. We apply both every week across Sydney and NSW, so here is how they actually compare on site.

How each one works

Intumescent paint is a thin-film coating, usually a few hundred microns to a few millimetres thick. In a fire it swells many times its applied thickness and forms a carbon char that insulates the steel. Day to day it looks like paint and can be top coated in almost any colour.

Vermiculite fire spray is a lightweight cement and vermiculite mix sprayed on much thicker, typically tens of millimetres. It doesn't need to react to work. Its bulk and low conductivity insulate the steel from the start. The finish is textured and grey or off-white, so it suits areas where looks don't matter.

Side by side

Intumescent paintVermiculite fire spray
FinishSmooth, paintable, architecturalRough, textured, functional
ThicknessThin film (microns to a few mm)Thick (typically 10–50 mm+)
Cost per m²Higher, rises steeply at FRL 90–120Usually lower, especially at higher FRLs
Best forExposed steel, shopfronts, lobbies, balconies, off-site coatingCarparks, plant rooms, above ceilings, warehouses, ductwork
Surface prepBlasted or prepared steel plus compatible primerClean steel, often over primer or mesh as the system requires
DurabilityHard film; external use needs the right system and top coatCan be damaged by impact; best in protected areas
ProgrammeMultiple coats and drying time; can be done off-siteFast coverage on site; messy, so it needs masking
Vermiculite fire spray to structural steel at Westbourne Building A
Vermiculite fire spray to structural steel, Westbourne Building A, Sydney.

What drives the thickness and the price

Neither system has one standard thickness. The required dry film thickness (intumescent) or spray thickness (vermiculite) is read from the manufacturer's assessed data. It depends on:

  • The FRL. 120 minutes needs far more material than 60 minutes. With intumescent the jump can be steep.
  • The section's exposed surface area to mass ratio (ksm). Light, thin sections heat faster and need more protection than heavy ones. A 150UC30 needs more than a 310UC118 for the same FRL.
  • 3-sided or 4-sided exposure. A beam supporting a slab is usually treated as 3-sided.
  • Critical steel temperature from the structural engineer, where provided.
  • Access, height, masking and site conditions. These matter on small jobs as much as the material does.

As a rule of thumb, small light sections at FRL 90–120 are where vermiculite usually wins on price. Exposed steel at FRL 30–60 is where intumescent is often the sensible choice.

Which one should you choose?

  • Steel will be visible (retail, lobbies, residential, external columns): intumescent.
  • Steel is hidden or in a back-of-house area (carpark, plant room, above a ceiling): vermiculite, usually at lower cost.
  • High FRL on light sections: price both. Vermiculite is often far cheaper.
  • Steel is being fabricated and you want it ready to erect: off-site intumescent can save site time.
  • Galvanised steel: both are possible, but the system must allow for galvanising and use the correct primer.

We often quote both options side by side so the builder can see the trade-off clearly.

Compliance and sign-off

Whichever system you choose, it must be used within its tested and assessed scope (AS 1530.4 testing, with steel design to AS 4100). It has to be applied at the thickness that scope requires. We record thickness readings, and at handover we issue an installation certificate stating the product, FRL and members treated, ready for your certifier.

Need this priced?

Send your drawings, fire engineering report or a few photos. We'll come back with a fixed quote, the tested system we'd use, and an installation certificate at handover.